Difference between revisions of "How do I Run a Reorder Report?"
(Bulk update) |
(Bulk update) |
||
Line 23: | Line 23: | ||
{{KB_Tags|reorder, reordering, supplier, stock, part, purchase, preferred supplier, projected, maximum, minimum, reorder level, level, levels, orders, ordering, quick quide, in depth}} | {{KB_Tags|reorder, reordering, supplier, stock, part, purchase, preferred supplier, projected, maximum, minimum, reorder level, level, levels, orders, ordering, quick quide, in depth}} | ||
− | {{FAQ}}{{KB_ST}} | + | {{FAQ}}{{How}}{{KB_ST}} |
Latest revision as of 05:31, 19 June 2019
Contents
Summary
Choose from the articles detailed below to assist you with Stock Reordering.
More Information
Please choose the article which best suits your reordering needs:
An In Depth Guide to Reordering
The Reordering program in Platinum has been designed to provide you with tighter, more efficient stock control by having the system review your maximum and reorder levels regularly, taking sales, orders and stock levels into account, and once you have reviewed and confirmed your maximum and reorder levels, you can then place orders based on these levels. It is intended to help you to achieve the best possible stocking levels and stock turn.
If you wish to take advantage of the full capabilities of this option, please click here.
A Quick Guide to Reordering
If you prefer to calculate stock to order using your current Maximum and Reorder levels, please click here.
Please bear in mind the In Depth guide explains how to utilise the reordering system to its full potential.
See also
- How do I View or Amend my Stock Optimisation Settings?
- How do I Write my Own Reorder Formula?
- How do I Set Maximum and Reorder levels on Stock?